ONE PRACTICE. FIVE DISCIPLINES.

The ABECA Ecosystem

Audit → Design → Inspect → Protect → Support. Every ABECA engagement fits somewhere on this line — the full lifecycle of Division 27 & 28 infrastructure, covered by one independent RCDD instead of a different vendor for each phase. Whether you need one stage or all five, it's the same standards, the same eye for detail, start to finish.

01

Audit: Existing Conditions & Due Diligence

Independent read on what's actually in the walls before you commit capital.

Before ABECA writes a single recommendation, we get an honest picture of what's actually in the walls — not what the as-builts say, not what the previous contractor claims. An infrastructure audit, RFP review, or bid-leveling pass tells us exactly where the gaps are, what's compliant, and what's about to become your problem. Every finding traces back to a specific BICSI, TIA, or NFPA reference — never an opinion.

  • Infrastructure Assessment
  • RFP & Bid Review
  • Existing-Conditions Survey
02

Design: Pre-Construction & Engineering

RCDD-stamped Division 27 & 28 design, built to the standards that get enforced.

When it's time to build, ABECA delivers RCDD-stamped Division 27/28 design — copper and fiber backbone sizing, TR/IDF planning, and specifications that hold up under plan review the first time. Decades designing for data centers, healthcare, education, finance, and broadband networks means the drawings account for how the space actually gets used.

  • RCDD-Stamped Design
  • Backbone & Riser Design
  • Division 27/28 Specifications
03

Inspect: Construction-Phase QA

On-site verification at every phase, so nothing gets closed up wrong.

Rough-in, trim-out, final — ABECA walks every phase your Division 27 & 28 scope goes through, and reports what we actually see, not what the installing contractor wants you to hear. Pathway, space, and labeling checks catch problems while they're still cheap to fix.

  • Rough-In & Trim-Out QA
  • Standards Compliance
  • Commissioning Oversight
04

Protect: Close-Out & Warranty Assurance

Confirming the paperwork matches the install before anyone signs off.

A structured cabling plant is built to last 20–25 years — but only if the paperwork behind it actually holds up. ABECA audits as-builts, test reports, and manufacturer warranty registrations before they get filed away and forgotten.

  • Close-Out Document Audit
  • Warranty Registration
  • Change Order Review
05

Support: Ongoing Advisory & Retainer

An RCDD on call for the life of the building, not just the ribbon-cutting.

Most consultants disappear at close-out. ABECA doesn't. Whether it's an advisory retainer, quarterly infrastructure reviews, technology master planning, or stepping in as your owner's representative, we stay engaged for as long as the relationship makes sense.

  • Bench Support Retainer
  • Technology Master Planning
  • Staff Training

Ready to put one RCDD across your entire project?

Dr. John M. Thurber, RCDD, CSI · jthurber@abecatech.com · 918.370.3870 · Sand Springs, OK · Available Nationwide

ABECA Technology Solutions

ABECA Technology Solutions

Sand Springs, OK  ·  Serving North America

RCDD Certified Practice

Credentials

  • RCDD — Registered Communications Distribution Designer
  • CSI — Construction Specifications Institute
  • Division 27 / Division 28 Specialist
  • Founded 2009 · Full RCDD Practice Since 2015

© 2026 ABECA Technology Solutions. All rights reserved.

Independent consulting — no hardware sales, no installation labor.